Posted by
lmcf
17 yrs ago
Does anyone know the standard method HK for laying a solid floor on a base surface. The surface is rough concrete since the previous tile/ floors were removed by jackhammer. Should the concrete be relaid, or can one just use lay the sub-board on-top of the rough concrete? Should the sub-board be sized to fit exactly with no gaps, or are slight gaps ok? thnx!
Please support our advertisers:
lmcf
17 yrs ago
Thanks for your reply Woder. We have existing skirting that will match the new floor. Will this skirting be "ruined" when we lift the old floor? Would we have to replace the skirting also?
Please support our advertisers:
You must be logged in to be able to reply.
Login now
Copy Link
Facebook
Gmail
Mail